Software Engineering

System Integration & Central Platforms

Middleware and central systems that feed several applications from a single source of truth, at public-sector scale.

Book an intro call30 min · same-business-day reply

or fill in the form

Tell us about your project, we reply the same business day

Your details are used only to answer your request. Privacy policy

System integration is feeding applications that run independently from a single source of data. GG Tech's System Integration & Central Platforms service builds that layer: the shared data model, the integration layer above it, the gateways to outside institutions, and a staged cutover that keeps the old system serving until the new one is ready. We do not sell a packaged product — our angle is the layer that connects the products you already run.

GG Tech Teknoloji estimation model — System Integration & Central Platforms · Last reviewed: 2026-10-14
Typical team1 architect + 2 developers + 1 tester
Calendar band8–24 weeks
Phase split20% current-state analysis · 30% shared data model · 35% integration layer · 15% staged cutover

What grows the budget

  • Number of source systems
  • Data quality in the sources
  • Zero-downtime requirement
  • Gateways to outside institutions

Signs of underbudgeting

  • No rollback plan
  • Data ownership undecided

These are GG Tech Teknoloji planning bands, not a quote; starting prices are on each service page. Every project is different, so the bands are deliberately wide; they assume a senior, focused team and typical scope, and your project is estimated individually.

How do we work?

  1. 1

    Current-state analysis

    An inventory of the source systems: who owns which record, where the same data is written twice, and which integration already exists in a spreadsheet.

  2. 2

    Shared data model

    One model every application reads from, plus the mapping from each source system into it. The data dictionary is written here, not at the end.

  3. 3

    Integration layer

    The middleware itself: API contracts, idempotent writes, conflict rules, and the gateways to outside institutions.

  4. 4

    Staged cutover

    The new system is stood up on its own server and verified in a test environment while the old one keeps serving. The switch happens inside a planned window, with a rollback path that stays open.

What do we deliver?

System Integration & Central Platforms

Source-system inventory and data ownership map
Shared data model and data dictionary
API contracts (OpenAPI) for the integration layer
Idempotency and conflict-resolution rules
Cutover and rollback plan
Handover documentation for your in-house team

Proof from production

6

applications fed from one source

1

hour cutover window

0

minutes of downtime

The application count is read from the Çekmeköy Municipality codebase; the cutover window and downtime come from the team that ran the cutover.

Read the case study: Çekmeköy Belediyesi

Last updated:

Let's talk about your project, we reply the same business day.

A 30-minute intro call: scope, timeline band and the right team.

Clutch 5.0 · team of 20 · Çekmeköy Municipality, NSC Soft, UKX

Message on WhatsApp
Book a callWhatsApp